INDUSTRIAL OVERVIEW

VTTL

The clients required a green field development at Hosur to relocate their tractor manufacturing. The plant was to be designed to have a capacity to produce 36,000 units per annum. The process flow determined the extent of the main production building. 10 Acres out of 14 acres was used to accommodate the 15000 SQM of building.

Soundarya

MVDE

ITC

Dairy Day

VTTL